Hi,
Until now I was archiving projects from 5TB to 10TB, but I'll soon have to archive 150TB (and more) projects.
It's quite complicated to split this in multiple archives and I want to avoid that as much as possible.
Running a backup job for 1 month is not a problem for me, but I'm wondering about the software limits..
Are there limits such as files number per job, total backup size, backup time span (..) I should consider ?
Thanks for any advice